Your flooring installation process will involve plenty of activities where you need to handle plenty of waste properly. Whether you like to install any floating floor for vinyl, hardwood floor, laminates, you need to keep your home clean and tidy.
You can find the right installer in your area from the FlooringDomain professional flooring installers directory. While installing a new floor lots of activities will take place and hence you need to plan everything properly so that total project can be complete in a smooth manner.
You can call your carpet contractors only after you have made a proper plan in the following way:
1. Take your children and pets to a safe place
When flooring installation will start there can be lots of noise and dust, that can disturb the peace of mind of your pet dog or cats and also young children. To prevent any mishap during such occasions, it will be better to take them to some safer place.
2. Remove the entire delicate and valuables
Since there will be too much dust and the presence of many workers, hence it will advisable to remove the entire valuable and delicate items to a certain safer place, so that they may not be damaged, stolen or mishandled.
3. Find out whether new flooring will raise the floor height
Often after the installation of a new floor, the final floor height gets raised up a bit, particularly if the previous flooring is not removed. In such a condition, there is a need for adjusting your doors, otherwise, they may not open properly. You must be proactive about it.
4. Remove all the furniture
Before the flooring installation team arrives, you have to clear the room, and hence the entire heavy furniture or any other item must be removed. There should be nothing available on the floor so that team can work.
5. Properly arrange the room
Total arrangement of all other rooms must also be done if you have shifted the items to any other room so that everything remains fully organised and tidy. You must ensure that there are no obstructions and the workers can move freely without any obstructions.
6. Close all other rooms
The other rooms where there will not be any floor installation must remain closed and sealed so that dust generated may not enter into those rooms.
7. Designate a place for waste disposal
There will be lots of waste materials generated when the old floorings will be removed. So, you need to designate a suitable location within the boundary where all the waste materials can be temporarily dumped till the job is completed.
You may later call a garbage removal company after the whole work is completed.
8. Call the installer
When you are fully ready with all the above, then you can call the floor installer team to start their work.
Often flooring contractors for floor coverings may also help in shifting your heavy furniture, however, they may charge for that. You must discuss that out when you are hiring them.